Independent snagging inspections · we work for the buyer, never the developer RPSA member · PI insured £2m
Office0117 946 0000 Emailoffice@snagwright.com Report turnaround48 hours
A new build extension under construction with blockwork and a steel beam

Bristol · South West · South Wales

The developer's inspector works for the developer

We are instructed by you, the buyer. We inspect before you complete, list every defect against the NHBC standards, and give you a report the builder cannot wave away.

What a snagging inspection actually buys you

A new build is the only major purchase most people make without an independent check. The site manager's own sign-off is not an independent check — it is the seller marking their own homework.

We spend three to five hours in the property with a moisture meter, a thermal camera, levels and a lot of patience. Every defect is photographed, located to a room, and graded against what the warranty provider will actually enforce.

The result is a document your developer's customer care team has to work through item by item. Buyers typically get between 150 and 400 items on a first inspection. That is not us being difficult — that is the current state of the industry.

How we grade defects

The full method →

Recent inspections

Anonymised at client request
  • Fine shrinkage cracking across a plastered wall
    4-bed detached · Emersons Green

    287 items at pre-completion

    Including a soil vent pipe terminating inside the loft void. The buyer delayed completion by nine days; all C1 items were resolved before the money moved.

    C1 · 4C2 · 231C3 · 52
  • Peeling and blown plaster on a wall surface
    2-bed apartment · Bristol Harbourside

    Damp traced to a blocked cavity

    Reported by the buyer as condensation. Moisture readings and thermal imaging put it at a mortar-bridged cavity behind the bedroom wall — a build defect, not lifestyle.

    C1 · 1C2 · 96C3 · 18
  • Close view of roof tiles with weathering
    3-bed semi · Weston-super-Mare

    Two-year review, 41 items still open

    The developer had marked the original list as closed. Nineteen items had never been touched; four had been made worse by the remedial visit.

    C2 · 34C3 · 7
“We were told by the site manager that the pre-completion inspection was not something buyers were allowed to arrange. Snagwright sent us the section of the New Homes Quality Code that says otherwise, and the appointment was booked the next morning.”
Buyer · 4-bed detached, South Gloucestershire · March 2026

What we will not do

We do not accept work from developers, house builders or their contractors — not as a policy statement, but because it is the whole basis on which our report is worth anything to you. An inspector who takes builder work has an interest in the list being short.

We also do not quote a per-item price, take a percentage of anything recovered, or pad a report to justify the fee. Fixed fee, whatever we find.